Friday, March 18, 2016

Time to Throw the Switch!

We waited more than two months after the solar panels (14 - 320 watt panels) were installed (January 15th), to have them wired to our main box and have the DC electricity converted to AC.  The inspection took place quickly after all was installed and our new meter placed into operation.  This meter will run forward, but we prefer to see it run in reverse!  All of this took place after two trees were cut down entirely and a new roof installed where the panels fit.
junction box from panels

reverse running meter

hopefully saving $$$$ on electric bill


Sue throwing the switch on March 15th

No comments:

Post a Comment